Georgetown builders and irrigation contractors
Irrigation plans for Georgetown: permit and sealed plan
Georgetown will not take a permit form without a sealed plan. That is the part we do.
Fix your sprinklersWhat Georgetown asks for
Georgetown requires an irrigation permit before a sprinkler system is tied to city water. The permit form goes in online. A plan goes in with it. The plan must be sealed, stamped and signed by a licensed irrigator. Last checked: November 12, 2026.
SISCO draws and seals plans for Georgetown projects, under Texas license LI 31500.
Residential irrigation plans in Georgetown
Georgetown asks for a permit before a lawn sprinkler system is joined to city water. You apply online and upload a plan that is sealed, stamped and signed by a licensed irrigator. If the home has a new water service or meter, the city also asks for as-built plans.
We draw the plan for your lot and seal it under license LI 31500. Ask us about the as-built plan when you send the project.
Tell us what the city or your reviewer asks for. We prepare the plan to meet it.
Commercial irrigation plans in Georgetown
Business sites in Georgetown follow the same permit and upload. New meters are common on these sites, so as-built plans are often needed at the end.
Send us the site plan and the landscape plan. We prepare the sealed plan for the upload.
Tell us what the city or your reviewer asks for. We prepare the plan to meet it. See irrigation plans for commercial sites, or ask for a plan quote.
For the watering rules a finished system must follow, see Georgetown water utility.
When you need a permit
New systems: yes, before the work starts.
Repairs: no permit for pipe repairs on a system you have. The one exception is a new backflow device.
Contractors: must be registered with the city.
How it works
Email the site and landscape plans to service@siscoirrigation.com.
We draw the plan and seal it.
The permit form goes in on My Government Online, with the plan.
The system goes in and the backflow device is tested.
The test report is filed and the inspection is asked for.
The backflow test has a deadline
After the system goes in, a state-certified tester must test the backflow device. The report has to be filed online within 72 hours of the test. Then the inspection is asked for through the same city site. We can arrange a backflow inspection.
New meter? You need as-built plans
If the job has a new water service or a new meter, Georgetown also wants as-built plans. Those show the system the way it was really built. We revise the plan to match.
Planting new grass
Georgetown has its own watering rules for new lawns. Ask the water utility before the sod goes down.
Everything for Georgetown projects
The local water rules. See Georgetown water utility.
What a sealed plan must show. See Texas irrigation plan requirements and a sample irrigation plan.
How other Texas cities review plans. See irrigation plan review by Texas city.
Plans by trade. See plans for irrigation contractors, landscape architects and pool builders and landscapers.
Business sites. See irrigation plans for commercial sites.
Ready to send a project? Ask for a plan quote.
Georgetown plan questions
Do I need a permit for a sprinkler system in Georgetown?
Yes, before you install a system that is tied to city water.
Does the plan have to be sealed?
Yes. Georgetown asks for a plan sealed, stamped and signed by a licensed irrigator.
Do repairs need a permit?
Not pipe repairs on a system you have, unless the backflow device is replaced.
How fast can a plan be ready?
In as little as 3 days for a standard system, once we have the site and landscape plans.
Related pages
Start here: Irrigation plans in San Antonio.
Also useful: Georgetown Water Utility. Irrigation plans for Corpus Christi. Irrigation plans for Round Rock.
Send us one Georgetown project
Email service@siscoirrigation.com with the site and landscape plans. Georgetown's permit office is at permits@georgetowntexas.gov. Or reach out to the irrigation experts at SISCO Irrigation at 210-697-9086, Monday to Friday, 7:30 a.m. to 4:30 p.m.
We draw plans for every city in Austin and Central Texas.
