Plan, inspection, sod. Three SAWS steps stand between a new home and closing.

Fix your sprinklers

Three steps, in order

Every new home on SAWS water with a sprinkler system has three steps to clear. Miss one and the next one stops. Last checked: November 12, 2026.

Leer en español

Step one is the plan. SAWS reviews the irrigation plan before the system goes in.

Step two is the inspection. SAWS inspects the finished system. This began on January 1, 2026.

Step three is the sod. SAWS can allow extra watering for new grass, but only when the first two steps are done.

Step one: the plan review

A licensed irrigator draws and seals the plan. It goes to SAWS through an online form, before any pipe is laid. SAWS aims to answer in five business days.

What slows it down: a missing seal, zones that mix grass and beds, no pressure shown, or no rain sensor on the plan. We draw to the SAWS list, so the plan does not come back.

Step two: the inspection

When the system is in, the inspection is asked for online. SAWS expects to set a time within two business days. A licensed SAWS inspector runs the system and checks it against the plan.

The inspector also checks the soil under new sod. SAWS looks for 4 inches or more.

What slows it down: heads that spray the walk, a system that does not match the plan, or thin soil under the sod.

Step three: watering the new sod

New sod needs water every day at first. Drought rules allow one day a week. The SAWS new-landscape variance fills that gap. It allows extra watering for up to five weeks.

SAWS will not approve it without the plan on file and a passed inspection. Sod laid before then has to live on the normal schedule.

What happens if a step is missed

SAWS can keep a hold on the water account until the plan is approved and the system passes. That can touch your closing date. It is far cheaper to line the steps up before the slab is poured.

A timeline that works

  1. Send us the lot and landscape plans when the lot is released.

  2. We draw, seal and send the plan to SAWS, in as little as 3 days.

  3. SAWS approves the plan while the house is being framed.

  4. The system goes in and the SAWS inspection is requested.

  5. The variance is filed and the sod goes down.

How SISCO helps builders

We prepare the sealed plan and send it to SAWS. We answer review comments. We fix what an inspection flags. For builders with many lots, we set up one way of working and repeat it lot after lot. See irrigation plans in San Antonio.

Builder questions

When did SAWS start inspecting new sprinkler systems?

On January 1, 2026. Plan review for new systems began a year before, on January 1, 2025.

How long does SAWS plan review take?

SAWS aims to review and return a plan within five business days.

Can I lay sod before the inspection?

You can, but SAWS will not approve extra watering until the plan is on file and the system has passed.

How fast can SISCO have a plan ready?

In as little as 3 days for a standard home system, once we have the lot and landscape plans.

Related pages

Start here: Irrigation plans in San Antonio.

Also useful: SAWS new-landscape variance. Failed SAWS irrigation inspection. Sample irrigation plan.

Send us one lot

Email service@siscoirrigation.com with the lot and landscape plans. SAWS Conservation is at 210-704-7283. Or reach out to the irrigation experts at SISCO Irrigation at 210-697-9086, Monday to Friday, 7:30 a.m. to 4:30 p.m.